Monday, July 13, 2009

Defining the Lean Project Manager

I've met some good project managers, and some bad project managers. I think we all have. I've met some project managers who know a thing or two about lean thinking, and some who have never and will never make any attempt to learn about it. For the most part, I think the project management body of knowledge lacks a lot in terms of being a lean methodology, so it's natural for most project managers to lack knowledge of lean principles. The same goes for most types of managers. For lean project management to spread, we need to develop PM's who display the attributes and behaviors of a lean thinker.

So, what makes a Lean Project Manager?

While I've yet to achieve a level of understanding sufficient to call myself a Lean Project Manager, I do have some thoughts on the attributes that I need to attain to become one some day. Here goes:
  1. Communicator...This doesn't apply just to lean project managers; this is a prerequisite for all project managers. Written or verbal, formal or informal, one-on-one or in front of a group; PM's have to be able to communicate.
  2. Learner...This is also sort of inherent in the project management profession. Because we can be leading projects across a wide range of fields, we have to be quick learners if we want to be able to understand what our subject-matter experts are saying. We don't have to be experts in every field, but we have to be able to understand enough to manage the projects. Lean PM's take it to another level. A true Lean PM will make continuous learning a standard part of their work, not something to do in their spare time or accidentally. Establishing goals for self-development and then creating a strategic plan for achieving that goal is Lean PM behavior.
  3. Socratic Teacher...I think this is a big departure from standard project management. Most PM's tend to focus on solving problems as quick as possible, and don't take the time to use problems as learning opportunities. The Lean PM is always looking for learning moments with his project team. These moments don't occur in classrooms, but out where the work is being performed. The Lean PM doesn't teach by telling team members why problems occurred and how to fix them, but by asking elegant, insightful questions that force the team members to develop a strong understanding of the problem at hand. By doing this, the Socratic Teacher not only helps the team identify countermeasures to its problems, but also teaches it to be a self-reliant, self-adapting, problem-solving team.
  4. Systems Thinker...Again, this is an area where I think lean project management departs from mainstream project management. Most PM's tend to view projects as discrete packets of work that can be scheduled, delegated, measured, and completed by individuals or teams. The strong emphasis on the Work Breakdown Structure (WBS) as the primary planning tool is evidence of the way the project management community views work production. In the manufacturing operations world, ERP systems kind of perform the same function. This view on operations management stems from an erroneous assumption that a top-down push planning approach is capable of accurately predicting how the work will flow. A Lean PM does not try to control work through top-down planning. A Lean PM thinks in terms of self-sufficient systems that can rapidly adapt to the constantly changing conditions on the ground. The people closest to the work have the best shot at predicting the work flow, so Lean PM's focus on creating systems composed of well-trained, capable people performing well-refined, stable processes.
  5. Experimenter...Even well-oiled machines can become obsolete. For that reason, Lean PM's need to constantly tinker with their systems and encourage their team members to do the same. Every aspect of the project should be fair game. Will every idea be feasible? No. Will every feasible idea get implemented before the project is complete? No. Is this is a problem? Not at all. Just the simple act of proposing a mundane suggestion has a beneficial effect on the project team. It's exercise for the brain. Following standard processes for completing project work is efficient, but can be deflating for team members if they're not empowered to propose ideas for improvement. If the PM is not the Experimenter-In-Chief of the team, team members will not feel as free to make suggestions.
  6. Gemba Walker...Some traditional PM's will have big problems with this one. With the proliferation of powerful, easy-to-use IT solutions for project management, PM's are tempted to run the show through their computers, and not where the real work is being performed. The problem with this is that PM software only shows an abstract representation of the status of the work, not the actual status of the work. Lean PM's spend a crazy amount of time out at the gemba (the place where the real work is done) observing the work, learning, teaching, experimenting, and communicating. By spending time at the gemba and seeing reality firsthand, Lean PM's can identify waste and problems before they become project killers.
  7. Visual Manager...This is related to gemba walking. When we are observing work, we are much more effective if we have visual controls to aid us in understanding irregularities. A line chart is more effective if there's a benchmark line that shows the performance goal. It's much easier to determine whether a garbage can is in the right place if there's a spot marked on the floor showing where it goes. It's much easier to audit a process if a standard work chart is posted visually in the work area. Lean PM's constantly walk the gemba and ask "How do I know if this is right or wrong?" and insist that the status of the work be displayed visually at the workplace. Lean PM's should use the 30-second rule, which says that within 30 seconds a manager should be able to walk into the workplace and understand the status of the work. Then, Lean PM's should insist that information be shared with the entire team, via visual control boards, in order to "create participation through shared information."
These are the behaviors and attributes that I'm trying to incorporate into my practice of project management. I'm sure there are other elements that I'm missing, but I think this is a pretty good start. For the lean thinkers out there, I wonder what characteristics they've observed in PM's that they regard as lean project managers.

Sunday, July 05, 2009

Warning: Warranty Service May Induce Violence

You know, we in the construction industry do a darn good job of stressing-out our customers. Have you read Lean Solutions by James P. Womack & Daniel T. Jones? While their previous work, Lean Thinking, discusses the elimination of waste from our value streams, this book focuses on the elimination of waste and frustration endured by our customers in procuring our products/services. Here are the titles of a few chapters from the book: "Don't Waste My Time," "Get Me Exactly What I Want," and "Solve My Problem When I Want." In my experience as both a homeowner and a construction manager, I've yet to see an example of these requirements being consistently met by a builder (especially with respect to performing warranty service work). Ughh.

Typical Construction Industry Approach


We're pretty bad at this. We have to face this reality. Especially in the homebuilding sector, and specifically with home warranty repairs, some builders seem to make a living out of wasting customers' time, getting them something other than what they want, and not solving their problems when they want want. If you've ever bought a home with a builder warranty, you probably know what I'm talking about. These are just some of the difficulties I've personally encountered with getting my home serviced:
  • -Sub didn't show up
  • -Sub showed up extremely late
  • -Sub showed up without the proper materials
  • -Sub showed up on unscheduled or unconfirmed dates when nobody was home
  • -Nobody cleaned up the mess caused by the repairs
  • -The repair didn't actually fix the problem
  • -Sub needed 4 days advanced notice to schedule an appointment
  • -Sub only provides service during normal business hours
  • -Sub had to wait for approval from the builder
  • -Builder pulled the sub off of my repair to work on new construction
  • -Builder didn't inform the sub of the full extent of the repair
Like I said, these are just some of the problems I've encountered. Also, that list doesn't take into account all the problems that I've created for other customers in my former role as a construction manager for residential work. This is definitely an example of the pot calling the kettle black! I accept my mistakes, but I can't accept not doing anything to improve the way we handle warranty service.

The Lean Approach

So, lean thinker, what would you do differently if you were a construction manager? And you can't say "find another job." Here are some thoughts:
  • 1) Eliminate Defects...This is a blinding glimpse of the obvious, but we should begin by eliminating the root cause of warranty service--poor quality. Fewer defects lead to better quality, so we should use all the lean tools at our disposal to eliminate defects: standard work, job instruction, job methods, poka-yoke, visual management, etc.
  • 2) Hassle-Free Warranty Service...Since even Toyota can't achieve perfect quality, we must have a good warranty service process. This should be hassle-free for the customer. A big part of this is getting over the whole "we only set appointments for Monday thru Friday between 9 am and 5 pm, and we can't give you an exact time" mentality. That's just not practical for the typical customer. Most folks can't or don't want to take off several hours during a workday to wait around for a sub that might or might now show up on-time. And most of us don't want to leave strangers in the house alone, so it's not like we can just leave them a key or anything. Smart builders will work around the customer' schedule, which will often mean working on nights and weekends. Might this cost the builder more in the short-term? Absolutely. We'll either have to hire weekend crews or pay our normal crews overtime. We'll have to make our superintendents available over the weekend. This is reality. But, these short-term costs will be far outweighed by the long-term benefits of increased customer satisfaction. How much value would you assign to a customer who enthusiastically touts your customer service to everybody they know?
  • 3) One-Piece Flow Warranty Service...In addition to being hassle-free for our customers, warranty service needs to be as productive as possible for the builder. By definition, any work done in response to poor quality is waste. Therefore, we should seek to minimize the amount of resources we have to expend to perform this type of work. As any lean thinker knows, the optimal approach to production is one-piece flow. As I've previously discussed here, we typically "batch" construction work into specialized trades performed by specialty sub-contractors (drywallers, electricians, plumbers, etc.) who strive for local optimization of their scope of work, even at the expense of the overall project. A better way would be to look at warranty repairs holistically, and put together cross-functional teams capable of performing all the work required for a particular repair. When I had a wall repaired at my home, I had to wait for the drywall hanger to tear out the sheetrock, then the framer to replace a stud, then the drywall hanger again to replace the sheetrock, then the drywall finisher to tape, mud, and texture the sheetrock, then the trim guy to replace the base board, and finally the painter to paint the drywall and trim. It took over a month for this to happen, partly because we had to schedule the installations around my work schedule. What a nightmare! This work could have been performed in less than eight hours on a single Saturday had the builder utilized a cross-functional approach.
So, that's my prescription for better warranty service. Use lean tools to eliminate as much of it as you can, make the process hassle-free for the customer by working around their schedule, and minimize the waste for the builder by employing one-piece flow via cross-functional teams. Now, what are the myriad reasons why we can't do this? Old-school thinking? Short-term costs? Tradition? Lack of leadership?

Are those reasons more compelling that the potential of becoming the Toyota of homebuilding?

Wednesday, June 24, 2009

Give Construction Workers a Break!

When I was a kid growing up in Florida (home of the mighty Gators), I spent every hot, muggy summer working as a roofer for my dad. We tore off old shingle roofs and installed new ones at a frenetic pace. I would often find myself literally running across a roof with a handful of nails or a bundle of shingles. Pretty much on a daily basis I would come close to having a heat stroke (that's what running on a 120+ degree roof will do to you!). I just thought that killing yourself at work was part of the gig. Little did I know that I was experiencing firsthand what Lean thinkers call muri.

Muri is a concept borrowed from the Toyota Production System, and basically means "overburden, unreasonableness, or absurdity" according to Wikipedia. My experiences on those roofs all those years ago were definitely absurd, but not at all rare in the construction industry.

Typical Construction Industry Approach

We routinely ask our installers to perform superhuman feats: working in unbearable heat or in muddy conditions; carrying heavy materials by hand; performing ergonomically unsound installations that contort and strain the body; starting work at sunrise and finishing at sunset; and so on and so forth. This has happened since...well, forever. The excuse usually given is the old "Gotta get the job done come hell or high water!" adage. Or sometimes you get the "When I was young we didn't even take lunch breaks!" diatribe. What they really mean to say is "We have too much waste in our processes, so we make up for it by overburdening our people." or "We don't have faith in continuous improvement as a means for innovation, so we just go with what we've always done." Isn't that sad?

The Lean Approach

How would a lean thinker go about reducing muri on construction sites? As I've stated before, I'm not an expert in the Toyota Production System or Lean Enterprise, but here are some ideas:
  • Stand in the Circle...Construction managers should spend almost all their time on the job site, "Standing in the Circle" to deeply observe the work being done. This is different from just "making the rounds" from job site to job site. Being in a single place for an extended period of time exposes the senses to stimuli that we normally ignore, which helps us be more aware of working conditions. Once we are aware of what's happening on a job site, it's harder for us to overlook muri.
  • Team-Based Problem Solving...Construction managers should make it part of their everyday job to facilitate team-based problem solving. Make it extremely easy for employees, sub-contractors, inspectors, customers, and anybody else on the job site to make suggestions and have their ideas reviewed. Use a whiteboard posted on the job site to highlight problems that need to be addressed. Support experimentation with new installation techniques or new equipment. If we engage our people, they will tell us about the muri on the job site.
  • Manpower Planning...Think long-term when planning for manpower requirements. Scheduling extra manpower to avoid overburdening our people will certainly cost more in the short-term, but will result in tremendous savings over the long-term: reduced injuries leading to reduced WC costs; reduced employee turnover leading to reduced recruiting, hiring, training, and "new-guy" costs; and improved quality leading to reduced re-work costs.
  • Safety Planning...In the project safety plan, include provisions for good ergonomics and humane working conditions. Always provide sufficient ramps, scaffolding, ladders, etc. Have established standards for working in adverse weather conditions. Always provide creature comforts close to the job site: drinking water, toilets, hand cleaners, etc. Put a limit on the number of hours per week an installer can perform physical work. Rotate job tasks to avoid repetitive motion injuries.
  • Eliminate Waste!!!...Finally, the best way to reduce muri is to eliminate process waste from our work. Waste leads to longer completion times and additional costs, and forces our installers to work harder. If we remove waste, we create a win-win: the project is completed faster and cheaper, and our workers don't have to kill themselves to get the job done. It's obvious, if an installer doesn't have to walk out to the truck every five minutes to grab a tool, he can get the job done easier. If we're not waiting around for an answer from the architect on a change order, we don't have to work nights and weekends to finish the job on-time.
Your thoughts? What's holding us back from doing all that? Old-school thinking? Short-term costs? Tradition? Lack of leadership?

At some point (hopefully sooner rather than later), we need to get past the mentality that work is supposed to be hard. Work should be challenging, but not absurdly so. Work should be engaging (yes, even in the construction industry), not all-consuming. We can get past this historical barrier to operational excellence if we can accept that muri is a problem.

Friday, June 05, 2009

Batch & Queue Construction?

Have you ever been in line at a sandwich shop where the "sandwich artist" was making three sandwiches at a time?  You know, he pulls out three loafs of bread, puts the meat & cheese on all three sandwiches, wraps each of them in deli paper, and hands all three to the clerk at the cash register.  It's happened to me, and I was not amused.  Why?  Because I was first in line out of the three, and I had to wait three times as long to get my sandwich.  Not only that, but I had mine toasted and it was darn near cold by the time I sat down to eat it!  Okay, I'm a little demanding of my eateries, but I can't help it; I'm a lean geek.

What does this have to do with Lean?  It's all about batch-and-queue vs. one-piece flow (click here for a good explanation from the Shmula blog).

The Case for One-Piece Flow

In the lean manufacturing world, the debate on batch-and-queue production vs. one-piece flow production has long since ended (batch-and-queue lost).  Anybody who has studied the Toyota Production System understands the superiority of one-piece flow: reduced inventory, early detection of defects, reduced transportation, more scheduling flexibility, and (most importantly) an increased organizational awareness of the need to solve problems preventively due to the lack of buffers in a single-piece flow.

So, where do we stand with respect to these principles in the construction industry?

Batch & Queue Construction

I've had a difficult time explaining my thoughts on this.  My belief is that in the construction industry, we typically exhibit the traits of a classic batch-and-queue operation, even though we're not technically batching buildings together.  Here are some of the similarities:
  1. Work is done by specialized groups (concrete finishers, framers, drywallers, plumbers, electricians, etc.) dedicated to performing a narrow scope of work
  2. These specialized groups try to optimize their own operations, even if that means a delay in the completion of a building
  3. Item #2 above means huge amounts of time are spent waiting for the product to transition from one specialized phase to the next
  4. Because of the delays between specialized work phases, the cause & effect trail of defects can go cold, resulting in fewer problems getting solved at the root cause
  5. There is little collaboration between specialized groups, resulting in less innovation
Hey, lean geeks, does this sound familiar at all?

Lean Construction

So, what is the lean approach to construction?  What could be done to move from a batch & queue approach to a one-piece flow approach?  Do the construction folks think it's even necessary to make this transition in order to achieve operational excellence? Your thoughts?  I certainly don't have all the answers, but here are a few pie-in-the-sky ideas:
  1. Create multi-functional work groups, consisting of highly-skilled installers capable of performing a wide range of installations
  2. Equip your highly-skilled installers with all the equipment (possibly custom-built equipment) necessary to complete a wide range of installations
  3. Utilize visual management to encourage participation through shared information
  4. Pre-fab as much as you can inside factories on lean assembly lines
I'm sure that experts like Dr. Michael Mullens with the Housing Constructability Lab or Hal Macomber at Reforming Project Management have a lot more to say about this subject than me, but those are my wild fantasies.  Are they feasible?  Your thoughts?

Saturday, May 30, 2009

Short Attention Spans


If you want to see people sleep, just put a bunch of construction folks in a classroom.  We can't help it, but we're just more prone to stay awake when we're building something or pounding a few bottles of Shiner Bock (that's a Texas beer, for those of you having the misfortune of not living in the Lone Star State).  We're just not house-cats, if you know what I mean.  That's why I was happy to come across this article from the incredibly, incredibly, incredibly useful Gemba Pante Rei blog:


Basically, a one-point lesson is just a quick 5-10 minute learning opportunity focusing on a single topic (either basic knowledge, an improvement example, or a problem example).  I think this is an ideal format for developing people in the construction industry.  On construction sites, we're trained to "stay busy" and move from one task to the next.  With this mentality, we need to have an efficient and focused way of training our associates.

P.S. Be sure to check out the free template that is provided in the "One-Point Lesson" link above; it's a good one.

Monday, May 18, 2009

Old-School Vertical Hierarchies

As the saying goes, I wasn't born in Texas, but I ran here as fast as I could. When I arrived, I found that the Lone Star State produces some fine beer, specifically, Shiner beer...


While I could go on all day about the merits of Shiner Hefeweizen compared to the original Shiner Bock, that's not really the point of the above photo.  What I want to discuss is how folks on large-scale construction jobs view the relationships between the prime contractors, secondary contractors, sub-contractors, and so on.  

Typical Construction Industry Approach

In case you haven't figured it out yet, the construction industry typically views sub-contractor relations like the above photo...with each contractor dominating the one below it and being subservient to the one above it.  An old-school rigid, vertical hierarchy.  This is based on standard construction practice, which typically involves a contractor doling out aspects of the work to sub-contractors.  In this arrangement, the contractor is viewed as the customer and the sub-contractor is viewed as the provider of the product or service.  This is an external customer relationship, and it's repeated over and over again at each level of the hierarchy, so you can have dozens of external customer relationships on a job site.  How fun!  A bunch of people showing "respect" for their boss man above them.  Old school mentality.

The Lean Approach

From a Lean perspective, I would say a collaborative model would be more effective than a rigid vertical hierarchy.  If you've read Gemba Kaizen, then you know about the inverted pyramid that places management below the gemba (the place where the real work is done) in a support role.  Essentially, the gemba is viewed as the internal customer of management, and I would say that prime contractors should view their sub-contractors as their internal customers.  They should support them, not threaten them with punitive actions.  They should identify and solve problems, not pass the buck just because the contract says they can.

Your thoughts?  I'd be interested in learning if other traditional industries are as "old-school" in their relationships with vendors/suppliers.  How would you rank your industry's level of collaboration on a scale of 1 to 10, with 1 being a rigid, vertical arrangement and 10 being a progressive, Gemba Kaizen-like approach?

All I know is that until the construction industry embraces Lean thinking and begins working more collaboratively, we'll be doomed to mindless obedience and endless frustration.  Thank goodness we have beer.

Friday, January 30, 2009

Photos from the '09 International Builders' Show

I posted a whole bunch of photos from the 2009 International Builders' Show over at my other blog.  Check it out:

Friday, January 09, 2009

Guest Post @ Lean Six Sigma Academy

Ron Pereira over at the Lean Six Sigma Academy was kind enough to ask me to write a guest post for his popular blog.  Being totally stoked by last night's BCS National Championship game that my Florida Gators won, I decided to write about how Urban Meyer is in fact a Lean leader.  Check it out:  "Urban Meyer is a Lean Leader (and Go Gators!)"

Wednesday, January 07, 2009

From The Greeniuses blog: "Revolution in Consumption"

Here a link to my post over at The Greeniuses blog where I discuss how much I hate waste in all its forms:  "Revolution in Consumption"

Tuesday, January 06, 2009

A3's are Awesome

Got this A3 from the Lean Enterprise Institute:


I'm a big fan of the A3 methodology.  I loved Pascal Dennis' book "Getting the Right Things Done" and John Shook's new book "Managing to Learn."  If there's a single mistake that sticks out among all the mistakes I've made in attempting to implement Lean at my company, it's that I didn't introduce A3 and Hoshin Planning earlier.  By not having these systems in place, we failed to show how improvement activities were linked in with business results.  This led to our Lean initiative being viewed as an ancillary activity not critical to the mission in times of desperation (like we're facing now in the homebuilding industry).
What about you, you lean genius?  Did you have the knowledge and foresight to introduce the A3 approach early and often?  Was it effective as they portray it in the books?  What would you have done differently?  By the way, I hate you because your were either smarter or more experienced than me (just kidding ya'll).